February 4, 2009 Progress Shots


Almost there........here are some progress shots of the Little Malibu House from February 4, 2009. Note the water catchment and wood solar shades in the top image. The bottom image shows the North elevation: top floor contains main entry and kitchen/dining space; middle floor contains living room, two bedroom suites, covered work area and garage; ground floor has one bedroom suite, outdoor living room, bunk room & kichenette and utility space. Salt water pool also in progress.......